Demo was not completed over the weekend, but not for lack of trying. The minor plumbing complications caused us to not be able to get the sink and toilet out until after the plumber came. That happened today, so we're ready to clear the rest of the room.
Our lack of a power saw also proved to be a handicap in getting out the studs around the shower. They'd probably come out with a few good whacks from our trusty sledge hammer, but after two days of work neither of us had it in us.
3 comments:
These pics are bringing on my own PTSD when my bath was gutted this year. It was on the second floor. Something scary about being able to look that far down into your house! This new bath is going to be super. Can't wait for the results.
That was a lot of work. And it's so HOT.
great progress! not too much longer and we'll be seeing the after shots. :) and don't you just love the four legged assistants?